A catastrophic heatwave leads to widespread grid failure, forcing organisations to consider drastic action: a controlled shutdown of their primary data centre. This Microsimulation tests tactical preparedness, technical decision-making, and procedural clarity under constrained, real-time conditions. Ideal for stress-testing your organisation’s ability to respond, coordinate, and protect data when the lights go out.
Objective:
- Increase awareness to initial protocols required before datacentre shutdown procedures commence
- Validate Shut Down playbook and procedures
- Validate batch job requirements and dependencies between them and backup activities
- Validate Month End batch job timelines



